The Importance of Creating an Effective Project Assumptions List for Successful Project Management
Creating a comprehensive list of project assumptions is a critical, yet often overlooked aspect of effective project management. Project assumptions identify facts, constraints, dependencies, and conditions that are accepted as true for the purpose of planning a project. Defining project assumptions is essential to develop realistic project plans, timelines, budgets, and resource requirements. This guide will provide a thorough overview of what project assumptions are, why they are vital to project success, and how to create an effective project assumptions list.
Project assumptions profoundly influence all aspects of project management and development. Flawed, unrealistic, or unstated assumptions are a leading cause of project delays, cost overruns, scope creep, and overall project failure. By clearly defining project assumptions upfront, project managers create transparency around business needs, resources, budgets, timelines, and dependencies. This enables the project team to create achievable plans, validate feasibility, identify risks, and communicate expectations across stakeholders.
In this article, you will learn:
What are project assumptions and why are they important
Examples of common project assumptions
How to identify project assumptions
Best practices for documenting assumptions
How to manage and validate assumptions throughout a project
Tools for tracking project assumptions
Gaining skills in identifying, documenting, and managing assumptions will enable you to plan projects with confidence, clarity, and alignment across your team and stakeholders. Continue reading to master this essential project management technique.
What Are Project Assumptions?
Project assumptions are factors that are considered true, real, or certain for planning purposes without actual proof or demonstration. Assumptions include any statement about the project accepted as fact.
According to the Project Management Institute (PMI), a project assumption is "a factor in the planning process that is considered to be true, real, or certain, without proof or demonstration."
Assumptions are made about various aspects of a project, including:
Scope, requirements, and deliverables
Timelines, deadlines, and schedules
Costs, resources, and budgets
Availability of personnel, skills, equipment
Actions and participation of stakeholders
Organizational policies, structures, and culture
Project assumptions document the expectations, conditions, and uncertainties that could influence the project. They describe the way the project team believes the project will operate based on experience, evidence, and knowledge available at the current time.
Assumptions are a standard part of any project planning process. Due to unknowns and uncertainties in a project, assumptions enable project managers to develop plans, timelines, budgets despite incomplete information. As a project progresses, assumptions can be validated or invalidated as more information becomes available.
How Assumptions Relate to Project Constraints
Project assumptions are closely related to project constraints, but they are distinctly different concepts. Project constraints are limitations or restrictions that will impact the project. These are usually factors outside the control of the project team.
Typical constraints include:
Scope requirements
Budget limits
Deadlines
Resource availability
Technology capabilities
Contracts or regulations
Constraints are non-negotiable parameters that the project must accept and work within. Project assumptions and constraints work together to define the boundaries and environment in which the project will be delivered.
Why Are Project Assumptions Important?
Defining project assumptions is a critical project management tool for several reasons:
Assumptions Drive Project Planning
Project plans are built on a set of assumptions. The project schedule, resource requirements, costs, and activities will be based on the assumptions defined up front. Documenting assumptions enables better assessment of project feasibility during the planning stages.
Assumptions Provide Transparency
Clearly stating assumptions creates transparency and alignment around expectations among the project manager, team, sponsors, and stakeholders. Mismatched assumptions between groups can undermine plans and cause conflict.
Assumptions Identify Risks and Constraints
Examining assumptions reveals project risks, weaknesses, dependencies, and constraints that can be mitigated through more robust planning. Uncovering inaccurate assumptions prevents problems down the road.
Assumptions Enable Communication
A documented assumptions list improves communication and coordination with stakeholders. It reduces uncertainty by providing a common framework for decision making throughout the project lifecycle.
In summary, project assumptions are the foundation for building realistic project plans. They enhance clarity, alignment, risk management, and communications for the project team. High quality assumptions lead to high quality project execution.
Examples of Common Project Assumptions
Project assumptions will vary widely based on the type of project, industry, organizational context, and other factors. Here are some examples of typical assumptions made in project management:
The project will receive adequate funding to completion
Key personnel and resources will be available as scheduled
Other projects or initiatives will not impact priority or resourcing
Stakeholders will participate in reviews and approvals as planned
Subject matter experts will provide input on design and testing
No major changes to organizational leadership or structure
Vendors or contractors will deliver results on time and budget
Technology, equipment, and materials will function as indicated
Regulatory, legal, or environmental policies will remain unchanged
Customers or end-users will adopt and utilize the deliverables
Any factors taken for granted as true when planning the project could be assumptions that should be validated. The best way to identify assumptions is through collaborative planning sessions with project sponsors and key stakeholders.
How to Identify Project Assumptions
Identifying project assumptions takes place during the initiation and planning phases of the project lifecycle. Here are effective techniques to uncover assumptions:
Perform Stakeholder Analysis
Identify all groups and individuals who have an interest in the project deliverables to understand their expectations and perspectives. Discuss the project with both internal team members and external stakeholders to surface underlying assumptions.
Facilitate Planning Workshops
Hold sessions for stakeholders and team members to discuss the overall vision, objectives, deliverables, timelines, processes, and resource needs. Collaborative meetings enable people to share assumptions.
List Known Facts
Document all known facts about the project scope, budget, resources, timeline, delivery, quality measures, risks and constraints. Separate assumptions from verified facts.
Determine Uncertainties
Note where there are unknowns, gaps in information, or aspects still to be defined related to people, processes, technology, or environment. These gaps are where assumptions will be needed.
Develop Assumption Statements
Capture "what if this condition is true" statements to describe the uncertainties and bridge gaps in the project plan. Assumptions take the form of "If...then" scenarios.
Prioritize Assumptions
Focus on assumptions that have the greatest impact and probability of being invalid. Seek evidence to validate them first.
Confirm with Sponsors
Review the draft assumptions list with project sponsors and stakeholders to confirm or refine them. Alignment on assumptions provides a starting point.
With an initial set of assumptions captured, they can serve as a reference point during detailed project planning and execution.
Best Practices for Documenting Project Assumptions
Project assumptions are typically recorded in a few key documents for alignment and reference across the team:
Project charter – documents key assumptions as part of the business need, deliverables, and justification
Project plan – calls out major assumptions related to scope, schedule, resources, budget
Requirements – notes assumptions around user needs, processes, system capabilities
Risk register – identifies assumption uncertainties as project risks to be managed
Assumption log – tracks all assumptions in a central repository for monitoring
The assumption log or register serves as a guide for validating assumptions over the course of the project. Here are some best practices for developing the log:
List each assumption as a separate statement rather than bundled together
Use clear “If...then...” statement format for precision and analysis
Note any supporting evidence, source, or level of uncertainty
Designate owner, review dates, and status for tracking
Categorize assumptions (timing, resources, budget, etc.) for filtering
Prioritize critical assumptions that carry the most project risk
Provide space to record updates, outcomes, and lessons learned
Use a spreadsheet, table, or PM software to store the log for accessibility
Establish a change control process for new assumptions or updates to existing ones
Develop a communication plan for circulating to stakeholders
With a robust assumption log in place, the project manager has a tool to guide ongoing assumption reviews, validation, and management of changes.
Tips for Creating a Strong Assumption Log
Follow these tips for developing a thorough, useful project assumption log:
Name each assumption clearly and succinctly
Avoid vague, broad, bundled statements
Use "If...then" statement format
Note supporting data and uncertainty level
Assign owners for follow up
Set dates to revisit assumptions
Rank assumptions by priority and risk level
Design simple, easy to update log
Store log in accessible, collaborative platform
Establish change control procedures
Outline communication plan for assumptions
Investing time in a detailed assumptions log pays off through increased project transparency.
How to Manage and Validate Project Assumptions
The project manager plays an important role in guiding the team to continuously revalidate assumptions throughout the project lifecycle. Here are best practices for managing assumptions:
Review Assumptions Regularly
Discuss status and seek evidence for high-priority assumptions during standups or planning sessions. Make assumption reviews part of project meetings.
Design Experiments
Test assumptions early through proof of concepts, spikes, simulations, surveys, betas, and trial runs. Seek data to confirm assumptions.
Monitor Leading Indicators
Watch for signals that key assumptions may be false and require intervention. Act on warning signs.
Ask Probing Questions
Challenge teams by asking “what if your assumption is wrong?” to assess potential impacts. Play devil's advocate.
Evaluate Proposed Changes
Scrutinize new assumptions embodied in any requested project changes or scope additions. Ensure alignment.
Inspect Deliverables
Require evidence to validate assumptions within project documents, plans, designs, and software releases. Tie assumptions to work.
Retest Old Assumptions
Revalidate previously proven assumptions when new information arises. Check for shifts.
Perform Premortem Analysis
Hypothesize that assumptions failed and examine how that impacted the project. Learn from potential futures.
Through active monitoring, the project manager can confirm assumptions remain true or identify false assumptions before they undermine project success.
As assumptions are validated or found to be invalid, update the:
Project documents and plans
Requirements, budgets, schedules, resources
Assumption log with status, outcomes and lessons learned
By continually managing assumptions, projects remain aligned with reality even as situations change.
Techniques to Validate Project Assumptions
Use these methods to inspect assumptions and determine if they are true or false:
Design tests, prototypes, simulations
Create experiments or pilots
Analyze metrics, leading indicators
Conduct surveys, interviews
Perform audits, inspections
Request data, evidence from team
Monitor external environments
Consult subject matter experts
Research vendor claims or historical data
Building a habit of proactively validating assumptions will drive project success.
Helpful Tools for Tracking Project Assumptions
Project managers can leverage certain tools to better record assumptions and align teams:
Assumption Logs and Registers
Central list for documenting, categorizing, and prioritizing assumptions in detail. Critical for assumption management.
Project Management Software
Tools like Trello, Asana, Smartsheet, and MS Project help manage assumption registers, status, owners and tasks.
Collaboration Platforms
Slack, Teams, SharePoint enable teams to discuss, review, and get updates on assumptions.
Mind Mapping Software
Visual maps show relationships between assumptions for analysis.
Whiteboards
Post and visualize assumptions in team workspaces for visibility.
Spreadsheets
Useful for filtering, organizing, rating, and monitoring assumption details over time.
Surveys
Collect input from team members on assumption validity.
Prototyping/Simulation Tools
Demonstrate assumptions through mock-ups, models, and sample testing.
The right tools provide structure for teams to collaboratively drive assumption validation.
Key Takeaways for Managing Project Assumptions
Project assumptions explicitly define accepted truths needed for project planning in the absence of facts.
Documenting assumptions creates transparency around stakeholder expectations, uncertainties, risks, and constraints.
Capturing assumptions enables assessment of project feasibility and a reference point for decision making.
Actively validating or invalidating assumptions is crucial to keeping project plans aligned with actual conditions.
Tools like assumption logs, statuses, and reviews help project teams manage assumptions collaboratively.
Ignoring assumptions is a frequent contributor to project failures. Developing skills in identifying and managing assumptions will enable you to plan projects realistically. By investing the time upfront to define project assumptions, you can gain alignment, mitigate risks, and maximize the probability of achieving successful outcomes.
In summary, here are the key things to remember about project assumptions:
Assumptions provide the foundation for building project plans
Clearly document assumptions for transparency and alignment
Include assumptions in the project charter, plan, requirements, and risk register
List each assumption separately in an assumption log
Continuously validate assumptions through review, testing, and monitoring
Update documents as assumptions change
Leverage tools to collaboratively manage assumptions
Focus on assumptions with the greatest risk impact
Align assumptions with constraints to bound the project
Mastering assumption management will enable you to expertly steer projects through uncertain conditions and accomplish positive results. Defining the right assumptions creates a roadmap to turn project plans into reality.
The Importance of Creating an Effective Project Assumptions List for Successful Project Management
Creating a comprehensive list of project assumptions is a critical, yet often overlooked aspect of effective project management. Project assumptions identify facts, constraints, dependencies, and conditions that are accepted as true for the purpose of planning a project. Defining project assumptions is essential to develop realistic project plans, timelines, budgets, and resource requirements. This guide will provide a thorough overview of what project assumptions are, why they are vital to project success, and how to create an effective project assumptions list.
Project assumptions profoundly influence all aspects of project management and development. Flawed, unrealistic, or unstated assumptions are a leading cause of project delays, cost overruns, scope creep, and overall project failure. By clearly defining project assumptions upfront, project managers create transparency around business needs, resources, budgets, timelines, and dependencies. This enables the project team to create achievable plans, validate feasibility, identify risks, and communicate expectations across stakeholders.
In this article, you will learn:
What are project assumptions and why are they important
Examples of common project assumptions
How to identify project assumptions
Best practices for documenting assumptions
How to manage and validate assumptions throughout a project
Tools for tracking project assumptions
Gaining skills in identifying, documenting, and managing assumptions will enable you to plan projects with confidence, clarity, and alignment across your team and stakeholders. Continue reading to master this essential project management technique.
What Are Project Assumptions?
Project assumptions are factors that are considered true, real, or certain for planning purposes without actual proof or demonstration. Assumptions include any statement about the project accepted as fact.
According to the Project Management Institute (PMI), a project assumption is "a factor in the planning process that is considered to be true, real, or certain, without proof or demonstration."
Assumptions are made about various aspects of a project, including:
Scope, requirements, and deliverables
Timelines, deadlines, and schedules
Costs, resources, and budgets
Availability of personnel, skills, equipment
Actions and participation of stakeholders
Organizational policies, structures, and culture
Project assumptions document the expectations, conditions, and uncertainties that could influence the project. They describe the way the project team believes the project will operate based on experience, evidence, and knowledge available at the current time.
Assumptions are a standard part of any project planning process. Due to unknowns and uncertainties in a project, assumptions enable project managers to develop plans, timelines, budgets despite incomplete information. As a project progresses, assumptions can be validated or invalidated as more information becomes available.
How Assumptions Relate to Project Constraints
Project assumptions are closely related to project constraints, but they are distinctly different concepts. Project constraints are limitations or restrictions that will impact the project. These are usually factors outside the control of the project team.
Typical constraints include:
Scope requirements
Budget limits
Deadlines
Resource availability
Technology capabilities
Contracts or regulations
Constraints are non-negotiable parameters that the project must accept and work within. Project assumptions and constraints work together to define the boundaries and environment in which the project will be delivered.
Why Are Project Assumptions Important?
Defining project assumptions is a critical project management tool for several reasons:
Assumptions Drive Project Planning
Project plans are built on a set of assumptions. The project schedule, resource requirements, costs, and activities will be based on the assumptions defined up front. Documenting assumptions enables better assessment of project feasibility during the planning stages.
Assumptions Provide Transparency
Clearly stating assumptions creates transparency and alignment around expectations among the project manager, team, sponsors, and stakeholders. Mismatched assumptions between groups can undermine plans and cause conflict.
Assumptions Identify Risks and Constraints
Examining assumptions reveals project risks, weaknesses, dependencies, and constraints that can be mitigated through more robust planning. Uncovering inaccurate assumptions prevents problems down the road.
Assumptions Enable Communication
A documented assumptions list improves communication and coordination with stakeholders. It reduces uncertainty by providing a common framework for decision making throughout the project lifecycle.
In summary, project assumptions are the foundation for building realistic project plans. They enhance clarity, alignment, risk management, and communications for the project team. High quality assumptions lead to high quality project execution.
Examples of Common Project Assumptions
Project assumptions will vary widely based on the type of project, industry, organizational context, and other factors. Here are some examples of typical assumptions made in project management:
The project will receive adequate funding to completion
Key personnel and resources will be available as scheduled
Other projects or initiatives will not impact priority or resourcing
Stakeholders will participate in reviews and approvals as planned
Subject matter experts will provide input on design and testing
No major changes to organizational leadership or structure
Vendors or contractors will deliver results on time and budget
Technology, equipment, and materials will function as indicated
Regulatory, legal, or environmental policies will remain unchanged
Customers or end-users will adopt and utilize the deliverables
Any factors taken for granted as true when planning the project could be assumptions that should be validated. The best way to identify assumptions is through collaborative planning sessions with project sponsors and key stakeholders.
How to Identify Project Assumptions
Identifying project assumptions takes place during the initiation and planning phases of the project lifecycle. Here are effective techniques to uncover assumptions:
Perform Stakeholder Analysis
Identify all groups and individuals who have an interest in the project deliverables to understand their expectations and perspectives. Discuss the project with both internal team members and external stakeholders to surface underlying assumptions.
Facilitate Planning Workshops
Hold sessions for stakeholders and team members to discuss the overall vision, objectives, deliverables, timelines, processes, and resource needs. Collaborative meetings enable people to share assumptions.
List Known Facts
Document all known facts about the project scope, budget, resources, timeline, delivery, quality measures, risks and constraints. Separate assumptions from verified facts.
Determine Uncertainties
Note where there are unknowns, gaps in information, or aspects still to be defined related to people, processes, technology, or environment. These gaps are where assumptions will be needed.
Develop Assumption Statements
Capture "what if this condition is true" statements to describe the uncertainties and bridge gaps in the project plan. Assumptions take the form of "If...then" scenarios.
Prioritize Assumptions
Focus on assumptions that have the greatest impact and probability of being invalid. Seek evidence to validate them first.
Confirm with Sponsors
Review the draft assumptions list with project sponsors and stakeholders to confirm or refine them. Alignment on assumptions provides a starting point.
With an initial set of assumptions captured, they can serve as a reference point during detailed project planning and execution.
Best Practices for Documenting Project Assumptions
Project assumptions are typically recorded in a few key documents for alignment and reference across the team:
Project charter – documents key assumptions as part of the business need, deliverables, and justification
Project plan – calls out major assumptions related to scope, schedule, resources, budget
Requirements – notes assumptions around user needs, processes, system capabilities
Risk register – identifies assumption uncertainties as project risks to be managed
Assumption log – tracks all assumptions in a central repository for monitoring
The assumption log or register serves as a guide for validating assumptions over the course of the project. Here are some best practices for developing the log:
List each assumption as a separate statement rather than bundled together
Use clear “If...then...” statement format for precision and analysis
Note any supporting evidence, source, or level of uncertainty
Designate owner, review dates, and status for tracking
Categorize assumptions (timing, resources, budget, etc.) for filtering
Prioritize critical assumptions that carry the most project risk
Provide space to record updates, outcomes, and lessons learned
Use a spreadsheet, table, or PM software to store the log for accessibility
Establish a change control process for new assumptions or updates to existing ones
Develop a communication plan for circulating to stakeholders
With a robust assumption log in place, the project manager has a tool to guide ongoing assumption reviews, validation, and management of changes.
Tips for Creating a Strong Assumption Log
Follow these tips for developing a thorough, useful project assumption log:
Name each assumption clearly and succinctly
Avoid vague, broad, bundled statements
Use "If...then" statement format
Note supporting data and uncertainty level
Assign owners for follow up
Set dates to revisit assumptions
Rank assumptions by priority and risk level
Design simple, easy to update log
Store log in accessible, collaborative platform
Establish change control procedures
Outline communication plan for assumptions
Investing time in a detailed assumptions log pays off through increased project transparency.
How to Manage and Validate Project Assumptions
The project manager plays an important role in guiding the team to continuously revalidate assumptions throughout the project lifecycle. Here are best practices for managing assumptions:
Review Assumptions Regularly
Discuss status and seek evidence for high-priority assumptions during standups or planning sessions. Make assumption reviews part of project meetings.
Design Experiments
Test assumptions early through proof of concepts, spikes, simulations, surveys, betas, and trial runs. Seek data to confirm assumptions.
Monitor Leading Indicators
Watch for signals that key assumptions may be false and require intervention. Act on warning signs.
Ask Probing Questions
Challenge teams by asking “what if your assumption is wrong?” to assess potential impacts. Play devil's advocate.
Evaluate Proposed Changes
Scrutinize new assumptions embodied in any requested project changes or scope additions. Ensure alignment.
Inspect Deliverables
Require evidence to validate assumptions within project documents, plans, designs, and software releases. Tie assumptions to work.
Retest Old Assumptions
Revalidate previously proven assumptions when new information arises. Check for shifts.
Perform Premortem Analysis
Hypothesize that assumptions failed and examine how that impacted the project. Learn from potential futures.
Through active monitoring, the project manager can confirm assumptions remain true or identify false assumptions before they undermine project success.
As assumptions are validated or found to be invalid, update the:
Project documents and plans
Requirements, budgets, schedules, resources
Assumption log with status, outcomes and lessons learned
By continually managing assumptions, projects remain aligned with reality even as situations change.
Techniques to Validate Project Assumptions
Use these methods to inspect assumptions and determine if they are true or false:
Design tests, prototypes, simulations
Create experiments or pilots
Analyze metrics, leading indicators
Conduct surveys, interviews
Perform audits, inspections
Request data, evidence from team
Monitor external environments
Consult subject matter experts
Research vendor claims or historical data
Building a habit of proactively validating assumptions will drive project success.
Helpful Tools for Tracking Project Assumptions
Project managers can leverage certain tools to better record assumptions and align teams:
Assumption Logs and Registers
Central list for documenting, categorizing, and prioritizing assumptions in detail. Critical for assumption management.
Project Management Software
Tools like Trello, Asana, Smartsheet, and MS Project help manage assumption registers, status, owners and tasks.
Collaboration Platforms
Slack, Teams, SharePoint enable teams to discuss, review, and get updates on assumptions.
Mind Mapping Software
Visual maps show relationships between assumptions for analysis.
Whiteboards
Post and visualize assumptions in team workspaces for visibility.
Spreadsheets
Useful for filtering, organizing, rating, and monitoring assumption details over time.
Surveys
Collect input from team members on assumption validity.
Prototyping/Simulation Tools
Demonstrate assumptions through mock-ups, models, and sample testing.
The right tools provide structure for teams to collaboratively drive assumption validation.
Key Takeaways for Managing Project Assumptions
Project assumptions explicitly define accepted truths needed for project planning in the absence of facts.
Documenting assumptions creates transparency around stakeholder expectations, uncertainties, risks, and constraints.
Capturing assumptions enables assessment of project feasibility and a reference point for decision making.
Actively validating or invalidating assumptions is crucial to keeping project plans aligned with actual conditions.
Tools like assumption logs, statuses, and reviews help project teams manage assumptions collaboratively.
Ignoring assumptions is a frequent contributor to project failures. Developing skills in identifying and managing assumptions will enable you to plan projects realistically. By investing the time upfront to define project assumptions, you can gain alignment, mitigate risks, and maximize the probability of achieving successful outcomes.
In summary, here are the key things to remember about project assumptions:
Assumptions provide the foundation for building project plans
Clearly document assumptions for transparency and alignment
Include assumptions in the project charter, plan, requirements, and risk register
List each assumption separately in an assumption log
Continuously validate assumptions through review, testing, and monitoring
Update documents as assumptions change
Leverage tools to collaboratively manage assumptions
Focus on assumptions with the greatest risk impact
Align assumptions with constraints to bound the project
Mastering assumption management will enable you to expertly steer projects through uncertain conditions and accomplish positive results. Defining the right assumptions creates a roadmap to turn project plans into reality.
The Importance of Creating an Effective Project Assumptions List for Successful Project Management
Creating a comprehensive list of project assumptions is a critical, yet often overlooked aspect of effective project management. Project assumptions identify facts, constraints, dependencies, and conditions that are accepted as true for the purpose of planning a project. Defining project assumptions is essential to develop realistic project plans, timelines, budgets, and resource requirements. This guide will provide a thorough overview of what project assumptions are, why they are vital to project success, and how to create an effective project assumptions list.
Project assumptions profoundly influence all aspects of project management and development. Flawed, unrealistic, or unstated assumptions are a leading cause of project delays, cost overruns, scope creep, and overall project failure. By clearly defining project assumptions upfront, project managers create transparency around business needs, resources, budgets, timelines, and dependencies. This enables the project team to create achievable plans, validate feasibility, identify risks, and communicate expectations across stakeholders.
In this article, you will learn:
What are project assumptions and why are they important
Examples of common project assumptions
How to identify project assumptions
Best practices for documenting assumptions
How to manage and validate assumptions throughout a project
Tools for tracking project assumptions
Gaining skills in identifying, documenting, and managing assumptions will enable you to plan projects with confidence, clarity, and alignment across your team and stakeholders. Continue reading to master this essential project management technique.
What Are Project Assumptions?
Project assumptions are factors that are considered true, real, or certain for planning purposes without actual proof or demonstration. Assumptions include any statement about the project accepted as fact.
According to the Project Management Institute (PMI), a project assumption is "a factor in the planning process that is considered to be true, real, or certain, without proof or demonstration."
Assumptions are made about various aspects of a project, including:
Scope, requirements, and deliverables
Timelines, deadlines, and schedules
Costs, resources, and budgets
Availability of personnel, skills, equipment
Actions and participation of stakeholders
Organizational policies, structures, and culture
Project assumptions document the expectations, conditions, and uncertainties that could influence the project. They describe the way the project team believes the project will operate based on experience, evidence, and knowledge available at the current time.
Assumptions are a standard part of any project planning process. Due to unknowns and uncertainties in a project, assumptions enable project managers to develop plans, timelines, budgets despite incomplete information. As a project progresses, assumptions can be validated or invalidated as more information becomes available.
How Assumptions Relate to Project Constraints
Project assumptions are closely related to project constraints, but they are distinctly different concepts. Project constraints are limitations or restrictions that will impact the project. These are usually factors outside the control of the project team.
Typical constraints include:
Scope requirements
Budget limits
Deadlines
Resource availability
Technology capabilities
Contracts or regulations
Constraints are non-negotiable parameters that the project must accept and work within. Project assumptions and constraints work together to define the boundaries and environment in which the project will be delivered.
Why Are Project Assumptions Important?
Defining project assumptions is a critical project management tool for several reasons:
Assumptions Drive Project Planning
Project plans are built on a set of assumptions. The project schedule, resource requirements, costs, and activities will be based on the assumptions defined up front. Documenting assumptions enables better assessment of project feasibility during the planning stages.
Assumptions Provide Transparency
Clearly stating assumptions creates transparency and alignment around expectations among the project manager, team, sponsors, and stakeholders. Mismatched assumptions between groups can undermine plans and cause conflict.
Assumptions Identify Risks and Constraints
Examining assumptions reveals project risks, weaknesses, dependencies, and constraints that can be mitigated through more robust planning. Uncovering inaccurate assumptions prevents problems down the road.
Assumptions Enable Communication
A documented assumptions list improves communication and coordination with stakeholders. It reduces uncertainty by providing a common framework for decision making throughout the project lifecycle.
In summary, project assumptions are the foundation for building realistic project plans. They enhance clarity, alignment, risk management, and communications for the project team. High quality assumptions lead to high quality project execution.
Examples of Common Project Assumptions
Project assumptions will vary widely based on the type of project, industry, organizational context, and other factors. Here are some examples of typical assumptions made in project management:
The project will receive adequate funding to completion
Key personnel and resources will be available as scheduled
Other projects or initiatives will not impact priority or resourcing
Stakeholders will participate in reviews and approvals as planned
Subject matter experts will provide input on design and testing
No major changes to organizational leadership or structure
Vendors or contractors will deliver results on time and budget
Technology, equipment, and materials will function as indicated
Regulatory, legal, or environmental policies will remain unchanged
Customers or end-users will adopt and utilize the deliverables
Any factors taken for granted as true when planning the project could be assumptions that should be validated. The best way to identify assumptions is through collaborative planning sessions with project sponsors and key stakeholders.
How to Identify Project Assumptions
Identifying project assumptions takes place during the initiation and planning phases of the project lifecycle. Here are effective techniques to uncover assumptions:
Perform Stakeholder Analysis
Identify all groups and individuals who have an interest in the project deliverables to understand their expectations and perspectives. Discuss the project with both internal team members and external stakeholders to surface underlying assumptions.
Facilitate Planning Workshops
Hold sessions for stakeholders and team members to discuss the overall vision, objectives, deliverables, timelines, processes, and resource needs. Collaborative meetings enable people to share assumptions.
List Known Facts
Document all known facts about the project scope, budget, resources, timeline, delivery, quality measures, risks and constraints. Separate assumptions from verified facts.
Determine Uncertainties
Note where there are unknowns, gaps in information, or aspects still to be defined related to people, processes, technology, or environment. These gaps are where assumptions will be needed.
Develop Assumption Statements
Capture "what if this condition is true" statements to describe the uncertainties and bridge gaps in the project plan. Assumptions take the form of "If...then" scenarios.
Prioritize Assumptions
Focus on assumptions that have the greatest impact and probability of being invalid. Seek evidence to validate them first.
Confirm with Sponsors
Review the draft assumptions list with project sponsors and stakeholders to confirm or refine them. Alignment on assumptions provides a starting point.
With an initial set of assumptions captured, they can serve as a reference point during detailed project planning and execution.
Best Practices for Documenting Project Assumptions
Project assumptions are typically recorded in a few key documents for alignment and reference across the team:
Project charter – documents key assumptions as part of the business need, deliverables, and justification
Project plan – calls out major assumptions related to scope, schedule, resources, budget
Requirements – notes assumptions around user needs, processes, system capabilities
Risk register – identifies assumption uncertainties as project risks to be managed
Assumption log – tracks all assumptions in a central repository for monitoring
The assumption log or register serves as a guide for validating assumptions over the course of the project. Here are some best practices for developing the log:
List each assumption as a separate statement rather than bundled together
Use clear “If...then...” statement format for precision and analysis
Note any supporting evidence, source, or level of uncertainty
Designate owner, review dates, and status for tracking
Categorize assumptions (timing, resources, budget, etc.) for filtering
Prioritize critical assumptions that carry the most project risk
Provide space to record updates, outcomes, and lessons learned
Use a spreadsheet, table, or PM software to store the log for accessibility
Establish a change control process for new assumptions or updates to existing ones
Develop a communication plan for circulating to stakeholders
With a robust assumption log in place, the project manager has a tool to guide ongoing assumption reviews, validation, and management of changes.
Tips for Creating a Strong Assumption Log
Follow these tips for developing a thorough, useful project assumption log:
Name each assumption clearly and succinctly
Avoid vague, broad, bundled statements
Use "If...then" statement format
Note supporting data and uncertainty level
Assign owners for follow up
Set dates to revisit assumptions
Rank assumptions by priority and risk level
Design simple, easy to update log
Store log in accessible, collaborative platform
Establish change control procedures
Outline communication plan for assumptions
Investing time in a detailed assumptions log pays off through increased project transparency.
How to Manage and Validate Project Assumptions
The project manager plays an important role in guiding the team to continuously revalidate assumptions throughout the project lifecycle. Here are best practices for managing assumptions:
Review Assumptions Regularly
Discuss status and seek evidence for high-priority assumptions during standups or planning sessions. Make assumption reviews part of project meetings.
Design Experiments
Test assumptions early through proof of concepts, spikes, simulations, surveys, betas, and trial runs. Seek data to confirm assumptions.
Monitor Leading Indicators
Watch for signals that key assumptions may be false and require intervention. Act on warning signs.
Ask Probing Questions
Challenge teams by asking “what if your assumption is wrong?” to assess potential impacts. Play devil's advocate.
Evaluate Proposed Changes
Scrutinize new assumptions embodied in any requested project changes or scope additions. Ensure alignment.
Inspect Deliverables
Require evidence to validate assumptions within project documents, plans, designs, and software releases. Tie assumptions to work.
Retest Old Assumptions
Revalidate previously proven assumptions when new information arises. Check for shifts.
Perform Premortem Analysis
Hypothesize that assumptions failed and examine how that impacted the project. Learn from potential futures.
Through active monitoring, the project manager can confirm assumptions remain true or identify false assumptions before they undermine project success.
As assumptions are validated or found to be invalid, update the:
Project documents and plans
Requirements, budgets, schedules, resources
Assumption log with status, outcomes and lessons learned
By continually managing assumptions, projects remain aligned with reality even as situations change.
Techniques to Validate Project Assumptions
Use these methods to inspect assumptions and determine if they are true or false:
Design tests, prototypes, simulations
Create experiments or pilots
Analyze metrics, leading indicators
Conduct surveys, interviews
Perform audits, inspections
Request data, evidence from team
Monitor external environments
Consult subject matter experts
Research vendor claims or historical data
Building a habit of proactively validating assumptions will drive project success.
Helpful Tools for Tracking Project Assumptions
Project managers can leverage certain tools to better record assumptions and align teams:
Assumption Logs and Registers
Central list for documenting, categorizing, and prioritizing assumptions in detail. Critical for assumption management.
Project Management Software
Tools like Trello, Asana, Smartsheet, and MS Project help manage assumption registers, status, owners and tasks.
Collaboration Platforms
Slack, Teams, SharePoint enable teams to discuss, review, and get updates on assumptions.
Mind Mapping Software
Visual maps show relationships between assumptions for analysis.
Whiteboards
Post and visualize assumptions in team workspaces for visibility.
Spreadsheets
Useful for filtering, organizing, rating, and monitoring assumption details over time.
Surveys
Collect input from team members on assumption validity.
Prototyping/Simulation Tools
Demonstrate assumptions through mock-ups, models, and sample testing.
The right tools provide structure for teams to collaboratively drive assumption validation.
Key Takeaways for Managing Project Assumptions
Project assumptions explicitly define accepted truths needed for project planning in the absence of facts.
Documenting assumptions creates transparency around stakeholder expectations, uncertainties, risks, and constraints.
Capturing assumptions enables assessment of project feasibility and a reference point for decision making.
Actively validating or invalidating assumptions is crucial to keeping project plans aligned with actual conditions.
Tools like assumption logs, statuses, and reviews help project teams manage assumptions collaboratively.
Ignoring assumptions is a frequent contributor to project failures. Developing skills in identifying and managing assumptions will enable you to plan projects realistically. By investing the time upfront to define project assumptions, you can gain alignment, mitigate risks, and maximize the probability of achieving successful outcomes.
In summary, here are the key things to remember about project assumptions:
Assumptions provide the foundation for building project plans
Clearly document assumptions for transparency and alignment
Include assumptions in the project charter, plan, requirements, and risk register
List each assumption separately in an assumption log
Continuously validate assumptions through review, testing, and monitoring
Update documents as assumptions change
Leverage tools to collaboratively manage assumptions
Focus on assumptions with the greatest risk impact
Align assumptions with constraints to bound the project
Mastering assumption management will enable you to expertly steer projects through uncertain conditions and accomplish positive results. Defining the right assumptions creates a roadmap to turn project plans into reality.