Mastering the Art of Project Handoff: A Comprehensive Handover Checklist and Template Guide

A successful project handoff is crucial for the overall success of every project. Handing off a project from one team to the next can make or break its implementation and closure. This comprehensive guide will teach you how to ensure a smooth transition during project handoffs.

Why You Need a Project Handoff Checklist and Template

A project handover checklist and template are essential tools for successful project handoffs. They help ensure that all project details and documentation are communicated between the outgoing and incoming teams and project managers. Without a proper handoff process, critical information can be lost, leading to budget overruns, missed deadlines, and incomplete deliverables. 

A checklist guarantees that nothing falls through the cracks. It provides a step-by-step guide for handing off project responsibilities, assets, plans, issues and risks. A template allows you to customize the handover document for each project's specific needs.

In this guide, we'll walk through creating a robust project handoff checklist and provide a free template to download. Following these best practices will lead to seamless project transitions and closures.

Elements of a Successful Project Handoff

What are the key ingredients for smooth project handoffs? Here are some essential elements:

Clear Communication Plan

Open and frequent communication is crucial during a transition between project teams. Set up meetings and calls to discuss handoff details. Exchange contact information and determine communication methods and frequency.

Knowledge Transfer Sessions

Schedule sessions for outgoing team members to walk through the project with new resources. Review plans, requirements, issues, risks, and status. Transfer knowledge face-to-face if possible.

Well-Documented Assets

Compile all project documents, files, deliverables and notes into a master repository. Make sure the new team has access. Document where assets reside.

Stakeholder Introduction

Introduce new team members and project manager to key stakeholders like clients and vendors. Discuss new roles and responsibilities.

Project Plan and Timeline Review

Walk through the current project plan and timeline. Convey must-hit deadlines and upcoming milestones. Discuss status and pending risks.

Transition Issues and Risk List

Create a list of open issues, risks, action items, decisions, etc. that require follow-up. Document mitigation steps.

Why are Successful Project Handoffs Important?

Well-executed project handoffs provide multiple benefits:

  • Prevents schedule delays - Keeps projects on track with no lags between transfers

  • Minimizes budget overages - Reduces costs by preventing duplicate work

  • Improves quality - Lowers defects by sharing knowledge and plans

  • Boosts team morale - Less frustrated team members with a structured transition

  • Enhances customer satisfaction - Manages expectations and prevents surprises

  • Drives project success - Increases on-time, on-budget delivery of business goals

In contrast, poor handoffs lead to disconnected teams, compromised timelines, and broken deliverables.

Creating a Project Handoff Checklist

A handoff checklist ensures you capture all critical details during a transition. Here are some tips for creating one:

  • Identify your audiences - Tailor sections for outgoing team, incoming team, stakeholders

  • Include logistical information - Names, roles, contact info, credentials

  • Add project artifacts - Documents, files, deliverables, repositories

  • Cover status and history - Milestones, timelines, issues, risks

  • Outline handoff tasks - Meetings, training sessions, introduction emails

  • Customize for each project - Adjust for size, complexity, phase, and specifics

Let's explore what belongs in each section of a robust project handoff checklist:

Team Transition Information

  • Outgoing team member names and new roles

  • Incoming team member names and new roles

  • Project sponsor and key stakeholder contacts

  • Location of historical project information and artifacts

Project Background

  • Business case or problem statement

  • Project charter or statement of work

  • Summary of project goals, scope, and deliverables

Project Plan Details

  • All project documentation - scope statement, requirements, specs, plans, etc.

  • Upcoming milestones, deliverables, and key dates

  • Task status and completion percentages

  • Change requests or plan deviation approvals

Status and Risks

  • Budget and financials

  • Open issues, risks, action items, decisions needed

  • Key dependencies or constraints

  • Recurring obstacles or challenges

Knowledge Transfer

  • Lesson learned logs

  • Meeting minutes and notes

  • Location of email conversations and chat history

  • Training or ramp-up needs

Final Steps

  • Communication plan for handoff period

  • Transition issue and risk mitigation plan

  • Project closeout or handoff sign-off

Now let's explore a sample project handoff checklist template you can customize.

[Free Project Handoff Checklist Template]

Below is a free, downloadable project handoff checklist template you can adapt for your specific project transitions.

Project Handoff Checklist

Project Name:

Outgoing Project Manager:

Incoming Project Manager:

Handoff Date Range:

1. Team Transition Information

  • Outgoing team members and new roles:

  • Incoming team members and new roles: 

  • Key stakeholder contacts:

  • Location of project artifacts and history:

2. Project Background

  • Business case or problem statement:

  • Project charter or statement of work:

  • Summary of goals, scope, deliverables:

3. Project Plan Details

  • All project documentation (scope, requirements, etc.):

  • Upcoming milestones and key dates:

  • Task status and completion percentages:

  • Approved change requests or plan deviations:

4. Status and Risks

  • Budget and financials:

  • Open issues, risks, actions, decisions:

  • Key dependencies or constraints:

  • Recurring obstacles:

5. Knowledge Transfer

  • Lessons learned logs:

  • Meeting minutes and notes:

  • Location of communications:

  • Training or ramp-up needs:

6. Final Steps

  • Handoff period communications plan:

  • Transition issue risk mitigation plan: 

  • Project closeout or handoff sign-off:

7. Sign-off

Outgoing project manager     Incoming project manager

[Name and signature]        [Name and signature]

[Date]            [Date]

This covers the key elements that need to be conveyed during a project transition. Use this template as a starting point and customize it for your specific project handoff needs. 

Best Practices for Successful Project Handoffs

Follow these proven practices to ensure your project transitions are seamless:

Plan handoffs early - Build time into the schedule, don't wait until the last minute.

Document everything - Overcommunicate details, document artifacts extensively.

Do in-person knowledge transfers - Convey tacit knowledge, allow for questions.

Introduce new team to stakeholders - Set expectations, build rapport.

Review plans collaboratively - Walkthrough status, surface gaps, risks.

Define follow-up actions - Document issues, assign owners, track progress.

Set a transition communications plan - Clarify contacts, cadence, methods.

Conduct lessons learned - Prevent repeating mistakes, improve handoffs.

Celebrate team accomplishments - Recognize efforts, energize for project close.

Handoff Checklist By Project Phase

Project handoff checklists will vary depending on the phase:

Project Initiation:

  • Business case

  • Project charter

  • Stakeholder register

  • Team roster and roles

  • Kickoff meeting minutes

Project Planning:

  • Scope statement

  • Requirements documents

  • Project schedule

  • Communications plan

  • Risk register

  • Procurement docs

Project Execution:

  • Status reports

  • Milestone accomplishments

  • Risks and issues

  • Change requests

  • Financials

  • Lessons learned

  • QA and UAT reports

Project Closure:

  • Final budget reconciliation

  • Delivery acceptance-Procurement closure

  • Resources reassigned

  • Lessons learned

  • Celebrations and next steps

Top 10 Project Handoff Fails to Avoid

Don't allow your project transitions to end up in this handoff horror story list:

  • No advance notice of handoff - Surprising team leads to friction.

  • Lack of documentation - Scrambling to recreate project artifacts.

  • Minimal knowledge transfer - Key context and history is lost.

  • Unclear roles - Confusion over who is responsible for what.

  • Gaps in stakeholder communications - Disconnects erode confidence.

  • Unresolved issues dumped - Critical decisions are dodged.

  • No transition plan - Chaotic period with drops in productivity.

  • Tribal knowledge not conveyed - Bus factor when experts leave.

  • Lessons learned not done - Past mistakes are repeated.

  • Unrealistic deadlines - Death march schedule sets false expectations.

seamless-project-handoffs

Well-executed project handoffs are a strategic imperative for organizations that manage lots of initiatives. Use this comprehensive guide to institute best practices across your project lifecycles.

Take the time to get handoffs right - your clients, team, and projects will thank you!

Here is a recap of the most important things to remember when handing off a project:

  • Use a handoff checklist template to ensure all details are captured

  • Provide adequate notice to transition teams smoothly

  • Transfer knowledge via in-person sessions if possible

  • Introduce new team to stakeholders early on

  • Walkthrough project status extensively and collaboratively

  • Document open issues, risks, and follow-up actions

  • Overcommunicate through a defined transition plan

  • Conduct lessons learned to improve future handoffs

  • Celebrate the accomplishments of outgoing team members

Mastering project handoffs enables successful delivery of strategic initiatives and programs. Use the tips in this guide to become a handoff ninja! Let me know if you have any other best practices to share.

Mastering the Art of Project Handoff: A Comprehensive Handover Checklist and Template Guide

A successful project handoff is crucial for the overall success of every project. Handing off a project from one team to the next can make or break its implementation and closure. This comprehensive guide will teach you how to ensure a smooth transition during project handoffs.

Why You Need a Project Handoff Checklist and Template

A project handover checklist and template are essential tools for successful project handoffs. They help ensure that all project details and documentation are communicated between the outgoing and incoming teams and project managers. Without a proper handoff process, critical information can be lost, leading to budget overruns, missed deadlines, and incomplete deliverables. 

A checklist guarantees that nothing falls through the cracks. It provides a step-by-step guide for handing off project responsibilities, assets, plans, issues and risks. A template allows you to customize the handover document for each project's specific needs.

In this guide, we'll walk through creating a robust project handoff checklist and provide a free template to download. Following these best practices will lead to seamless project transitions and closures.

Elements of a Successful Project Handoff

What are the key ingredients for smooth project handoffs? Here are some essential elements:

Clear Communication Plan

Open and frequent communication is crucial during a transition between project teams. Set up meetings and calls to discuss handoff details. Exchange contact information and determine communication methods and frequency.

Knowledge Transfer Sessions

Schedule sessions for outgoing team members to walk through the project with new resources. Review plans, requirements, issues, risks, and status. Transfer knowledge face-to-face if possible.

Well-Documented Assets

Compile all project documents, files, deliverables and notes into a master repository. Make sure the new team has access. Document where assets reside.

Stakeholder Introduction

Introduce new team members and project manager to key stakeholders like clients and vendors. Discuss new roles and responsibilities.

Project Plan and Timeline Review

Walk through the current project plan and timeline. Convey must-hit deadlines and upcoming milestones. Discuss status and pending risks.

Transition Issues and Risk List

Create a list of open issues, risks, action items, decisions, etc. that require follow-up. Document mitigation steps.

Why are Successful Project Handoffs Important?

Well-executed project handoffs provide multiple benefits:

  • Prevents schedule delays - Keeps projects on track with no lags between transfers

  • Minimizes budget overages - Reduces costs by preventing duplicate work

  • Improves quality - Lowers defects by sharing knowledge and plans

  • Boosts team morale - Less frustrated team members with a structured transition

  • Enhances customer satisfaction - Manages expectations and prevents surprises

  • Drives project success - Increases on-time, on-budget delivery of business goals

In contrast, poor handoffs lead to disconnected teams, compromised timelines, and broken deliverables.

Creating a Project Handoff Checklist

A handoff checklist ensures you capture all critical details during a transition. Here are some tips for creating one:

  • Identify your audiences - Tailor sections for outgoing team, incoming team, stakeholders

  • Include logistical information - Names, roles, contact info, credentials

  • Add project artifacts - Documents, files, deliverables, repositories

  • Cover status and history - Milestones, timelines, issues, risks

  • Outline handoff tasks - Meetings, training sessions, introduction emails

  • Customize for each project - Adjust for size, complexity, phase, and specifics

Let's explore what belongs in each section of a robust project handoff checklist:

Team Transition Information

  • Outgoing team member names and new roles

  • Incoming team member names and new roles

  • Project sponsor and key stakeholder contacts

  • Location of historical project information and artifacts

Project Background

  • Business case or problem statement

  • Project charter or statement of work

  • Summary of project goals, scope, and deliverables

Project Plan Details

  • All project documentation - scope statement, requirements, specs, plans, etc.

  • Upcoming milestones, deliverables, and key dates

  • Task status and completion percentages

  • Change requests or plan deviation approvals

Status and Risks

  • Budget and financials

  • Open issues, risks, action items, decisions needed

  • Key dependencies or constraints

  • Recurring obstacles or challenges

Knowledge Transfer

  • Lesson learned logs

  • Meeting minutes and notes

  • Location of email conversations and chat history

  • Training or ramp-up needs

Final Steps

  • Communication plan for handoff period

  • Transition issue and risk mitigation plan

  • Project closeout or handoff sign-off

Now let's explore a sample project handoff checklist template you can customize.

[Free Project Handoff Checklist Template]

Below is a free, downloadable project handoff checklist template you can adapt for your specific project transitions.

Project Handoff Checklist

Project Name:

Outgoing Project Manager:

Incoming Project Manager:

Handoff Date Range:

1. Team Transition Information

  • Outgoing team members and new roles:

  • Incoming team members and new roles: 

  • Key stakeholder contacts:

  • Location of project artifacts and history:

2. Project Background

  • Business case or problem statement:

  • Project charter or statement of work:

  • Summary of goals, scope, deliverables:

3. Project Plan Details

  • All project documentation (scope, requirements, etc.):

  • Upcoming milestones and key dates:

  • Task status and completion percentages:

  • Approved change requests or plan deviations:

4. Status and Risks

  • Budget and financials:

  • Open issues, risks, actions, decisions:

  • Key dependencies or constraints:

  • Recurring obstacles:

5. Knowledge Transfer

  • Lessons learned logs:

  • Meeting minutes and notes:

  • Location of communications:

  • Training or ramp-up needs:

6. Final Steps

  • Handoff period communications plan:

  • Transition issue risk mitigation plan: 

  • Project closeout or handoff sign-off:

7. Sign-off

Outgoing project manager     Incoming project manager

[Name and signature]        [Name and signature]

[Date]            [Date]

This covers the key elements that need to be conveyed during a project transition. Use this template as a starting point and customize it for your specific project handoff needs. 

Best Practices for Successful Project Handoffs

Follow these proven practices to ensure your project transitions are seamless:

Plan handoffs early - Build time into the schedule, don't wait until the last minute.

Document everything - Overcommunicate details, document artifacts extensively.

Do in-person knowledge transfers - Convey tacit knowledge, allow for questions.

Introduce new team to stakeholders - Set expectations, build rapport.

Review plans collaboratively - Walkthrough status, surface gaps, risks.

Define follow-up actions - Document issues, assign owners, track progress.

Set a transition communications plan - Clarify contacts, cadence, methods.

Conduct lessons learned - Prevent repeating mistakes, improve handoffs.

Celebrate team accomplishments - Recognize efforts, energize for project close.

Handoff Checklist By Project Phase

Project handoff checklists will vary depending on the phase:

Project Initiation:

  • Business case

  • Project charter

  • Stakeholder register

  • Team roster and roles

  • Kickoff meeting minutes

Project Planning:

  • Scope statement

  • Requirements documents

  • Project schedule

  • Communications plan

  • Risk register

  • Procurement docs

Project Execution:

  • Status reports

  • Milestone accomplishments

  • Risks and issues

  • Change requests

  • Financials

  • Lessons learned

  • QA and UAT reports

Project Closure:

  • Final budget reconciliation

  • Delivery acceptance-Procurement closure

  • Resources reassigned

  • Lessons learned

  • Celebrations and next steps

Top 10 Project Handoff Fails to Avoid

Don't allow your project transitions to end up in this handoff horror story list:

  • No advance notice of handoff - Surprising team leads to friction.

  • Lack of documentation - Scrambling to recreate project artifacts.

  • Minimal knowledge transfer - Key context and history is lost.

  • Unclear roles - Confusion over who is responsible for what.

  • Gaps in stakeholder communications - Disconnects erode confidence.

  • Unresolved issues dumped - Critical decisions are dodged.

  • No transition plan - Chaotic period with drops in productivity.

  • Tribal knowledge not conveyed - Bus factor when experts leave.

  • Lessons learned not done - Past mistakes are repeated.

  • Unrealistic deadlines - Death march schedule sets false expectations.

seamless-project-handoffs

Well-executed project handoffs are a strategic imperative for organizations that manage lots of initiatives. Use this comprehensive guide to institute best practices across your project lifecycles.

Take the time to get handoffs right - your clients, team, and projects will thank you!

Here is a recap of the most important things to remember when handing off a project:

  • Use a handoff checklist template to ensure all details are captured

  • Provide adequate notice to transition teams smoothly

  • Transfer knowledge via in-person sessions if possible

  • Introduce new team to stakeholders early on

  • Walkthrough project status extensively and collaboratively

  • Document open issues, risks, and follow-up actions

  • Overcommunicate through a defined transition plan

  • Conduct lessons learned to improve future handoffs

  • Celebrate the accomplishments of outgoing team members

Mastering project handoffs enables successful delivery of strategic initiatives and programs. Use the tips in this guide to become a handoff ninja! Let me know if you have any other best practices to share.

Mastering the Art of Project Handoff: A Comprehensive Handover Checklist and Template Guide

A successful project handoff is crucial for the overall success of every project. Handing off a project from one team to the next can make or break its implementation and closure. This comprehensive guide will teach you how to ensure a smooth transition during project handoffs.

Why You Need a Project Handoff Checklist and Template

A project handover checklist and template are essential tools for successful project handoffs. They help ensure that all project details and documentation are communicated between the outgoing and incoming teams and project managers. Without a proper handoff process, critical information can be lost, leading to budget overruns, missed deadlines, and incomplete deliverables. 

A checklist guarantees that nothing falls through the cracks. It provides a step-by-step guide for handing off project responsibilities, assets, plans, issues and risks. A template allows you to customize the handover document for each project's specific needs.

In this guide, we'll walk through creating a robust project handoff checklist and provide a free template to download. Following these best practices will lead to seamless project transitions and closures.

Elements of a Successful Project Handoff

What are the key ingredients for smooth project handoffs? Here are some essential elements:

Clear Communication Plan

Open and frequent communication is crucial during a transition between project teams. Set up meetings and calls to discuss handoff details. Exchange contact information and determine communication methods and frequency.

Knowledge Transfer Sessions

Schedule sessions for outgoing team members to walk through the project with new resources. Review plans, requirements, issues, risks, and status. Transfer knowledge face-to-face if possible.

Well-Documented Assets

Compile all project documents, files, deliverables and notes into a master repository. Make sure the new team has access. Document where assets reside.

Stakeholder Introduction

Introduce new team members and project manager to key stakeholders like clients and vendors. Discuss new roles and responsibilities.

Project Plan and Timeline Review

Walk through the current project plan and timeline. Convey must-hit deadlines and upcoming milestones. Discuss status and pending risks.

Transition Issues and Risk List

Create a list of open issues, risks, action items, decisions, etc. that require follow-up. Document mitigation steps.

Why are Successful Project Handoffs Important?

Well-executed project handoffs provide multiple benefits:

  • Prevents schedule delays - Keeps projects on track with no lags between transfers

  • Minimizes budget overages - Reduces costs by preventing duplicate work

  • Improves quality - Lowers defects by sharing knowledge and plans

  • Boosts team morale - Less frustrated team members with a structured transition

  • Enhances customer satisfaction - Manages expectations and prevents surprises

  • Drives project success - Increases on-time, on-budget delivery of business goals

In contrast, poor handoffs lead to disconnected teams, compromised timelines, and broken deliverables.

Creating a Project Handoff Checklist

A handoff checklist ensures you capture all critical details during a transition. Here are some tips for creating one:

  • Identify your audiences - Tailor sections for outgoing team, incoming team, stakeholders

  • Include logistical information - Names, roles, contact info, credentials

  • Add project artifacts - Documents, files, deliverables, repositories

  • Cover status and history - Milestones, timelines, issues, risks

  • Outline handoff tasks - Meetings, training sessions, introduction emails

  • Customize for each project - Adjust for size, complexity, phase, and specifics

Let's explore what belongs in each section of a robust project handoff checklist:

Team Transition Information

  • Outgoing team member names and new roles

  • Incoming team member names and new roles

  • Project sponsor and key stakeholder contacts

  • Location of historical project information and artifacts

Project Background

  • Business case or problem statement

  • Project charter or statement of work

  • Summary of project goals, scope, and deliverables

Project Plan Details

  • All project documentation - scope statement, requirements, specs, plans, etc.

  • Upcoming milestones, deliverables, and key dates

  • Task status and completion percentages

  • Change requests or plan deviation approvals

Status and Risks

  • Budget and financials

  • Open issues, risks, action items, decisions needed

  • Key dependencies or constraints

  • Recurring obstacles or challenges

Knowledge Transfer

  • Lesson learned logs

  • Meeting minutes and notes

  • Location of email conversations and chat history

  • Training or ramp-up needs

Final Steps

  • Communication plan for handoff period

  • Transition issue and risk mitigation plan

  • Project closeout or handoff sign-off

Now let's explore a sample project handoff checklist template you can customize.

[Free Project Handoff Checklist Template]

Below is a free, downloadable project handoff checklist template you can adapt for your specific project transitions.

Project Handoff Checklist

Project Name:

Outgoing Project Manager:

Incoming Project Manager:

Handoff Date Range:

1. Team Transition Information

  • Outgoing team members and new roles:

  • Incoming team members and new roles: 

  • Key stakeholder contacts:

  • Location of project artifacts and history:

2. Project Background

  • Business case or problem statement:

  • Project charter or statement of work:

  • Summary of goals, scope, deliverables:

3. Project Plan Details

  • All project documentation (scope, requirements, etc.):

  • Upcoming milestones and key dates:

  • Task status and completion percentages:

  • Approved change requests or plan deviations:

4. Status and Risks

  • Budget and financials:

  • Open issues, risks, actions, decisions:

  • Key dependencies or constraints:

  • Recurring obstacles:

5. Knowledge Transfer

  • Lessons learned logs:

  • Meeting minutes and notes:

  • Location of communications:

  • Training or ramp-up needs:

6. Final Steps

  • Handoff period communications plan:

  • Transition issue risk mitigation plan: 

  • Project closeout or handoff sign-off:

7. Sign-off

Outgoing project manager     Incoming project manager

[Name and signature]        [Name and signature]

[Date]            [Date]

This covers the key elements that need to be conveyed during a project transition. Use this template as a starting point and customize it for your specific project handoff needs. 

Best Practices for Successful Project Handoffs

Follow these proven practices to ensure your project transitions are seamless:

Plan handoffs early - Build time into the schedule, don't wait until the last minute.

Document everything - Overcommunicate details, document artifacts extensively.

Do in-person knowledge transfers - Convey tacit knowledge, allow for questions.

Introduce new team to stakeholders - Set expectations, build rapport.

Review plans collaboratively - Walkthrough status, surface gaps, risks.

Define follow-up actions - Document issues, assign owners, track progress.

Set a transition communications plan - Clarify contacts, cadence, methods.

Conduct lessons learned - Prevent repeating mistakes, improve handoffs.

Celebrate team accomplishments - Recognize efforts, energize for project close.

Handoff Checklist By Project Phase

Project handoff checklists will vary depending on the phase:

Project Initiation:

  • Business case

  • Project charter

  • Stakeholder register

  • Team roster and roles

  • Kickoff meeting minutes

Project Planning:

  • Scope statement

  • Requirements documents

  • Project schedule

  • Communications plan

  • Risk register

  • Procurement docs

Project Execution:

  • Status reports

  • Milestone accomplishments

  • Risks and issues

  • Change requests

  • Financials

  • Lessons learned

  • QA and UAT reports

Project Closure:

  • Final budget reconciliation

  • Delivery acceptance-Procurement closure

  • Resources reassigned

  • Lessons learned

  • Celebrations and next steps

Top 10 Project Handoff Fails to Avoid

Don't allow your project transitions to end up in this handoff horror story list:

  • No advance notice of handoff - Surprising team leads to friction.

  • Lack of documentation - Scrambling to recreate project artifacts.

  • Minimal knowledge transfer - Key context and history is lost.

  • Unclear roles - Confusion over who is responsible for what.

  • Gaps in stakeholder communications - Disconnects erode confidence.

  • Unresolved issues dumped - Critical decisions are dodged.

  • No transition plan - Chaotic period with drops in productivity.

  • Tribal knowledge not conveyed - Bus factor when experts leave.

  • Lessons learned not done - Past mistakes are repeated.

  • Unrealistic deadlines - Death march schedule sets false expectations.

seamless-project-handoffs

Well-executed project handoffs are a strategic imperative for organizations that manage lots of initiatives. Use this comprehensive guide to institute best practices across your project lifecycles.

Take the time to get handoffs right - your clients, team, and projects will thank you!

Here is a recap of the most important things to remember when handing off a project:

  • Use a handoff checklist template to ensure all details are captured

  • Provide adequate notice to transition teams smoothly

  • Transfer knowledge via in-person sessions if possible

  • Introduce new team to stakeholders early on

  • Walkthrough project status extensively and collaboratively

  • Document open issues, risks, and follow-up actions

  • Overcommunicate through a defined transition plan

  • Conduct lessons learned to improve future handoffs

  • Celebrate the accomplishments of outgoing team members

Mastering project handoffs enables successful delivery of strategic initiatives and programs. Use the tips in this guide to become a handoff ninja! Let me know if you have any other best practices to share.