The Ultimate Guide to Writing a Successful Project Outline: Templates and Tips

A comprehensive project outline is the foundation of any successful project and provides a detailed overview of your upcoming project plan. Investing time in creating a thorough outline will ensure your project stays focused and organized from start to finish. This ultimate guide will provide everything you need to know about crafting the perfect project outline, including outline templates, examples, components, and tips to write an effective outline that leads to project success.

Why You Absolutely Need a Solid Project Outline

Creating a detailed project outline is one of the most critical steps to take before kicking off any new project. An outline acts as your roadmap that guides the direction of your project throughout its lifecycle. Here are some of the key reasons why taking the time to write a comprehensive project outline is so important:

  • Keeps the entire project logically structured and focused from start to finish

  • Clearly defines the scope, objectives, requirements, and goals of the project 

  • Identifies all major project phases and milestones with target completion dates

  • Allows for accurate estimation and budgeting of resources and time requirements

  • Significantly improves team collaboration and task delegation

  • Minimizes scope creep and prevents the project from derailing off course

  • Provides documentation of all project details for current and future reference

  • Gives a detailed overview for stakeholders, sponsors, and project team members

  • Sets measurable criteria for defining project success

In short, investing time in developing a thorough project outline is essential for the success of any project, large or small. It serves as your blueprint guiding all aspects of your project planning and execution.

Step-by-Step Guide to Writing a Solid Project Outline

Now that you understand the immense value of creating a project outline, let's go through the key steps involved in writing a comprehensive outline from scratch:

Define Project Goals, Scope and Objectives

  • Clearly identify the high-level goals and objectives you want to accomplish

  • Define the overall scope and boundaries of the project

  • Outline the problem(s) to be solved and intended outcomes

  • Keep the scope realistic within time, cost and resource limits

Conduct Research and Information Gathering

  • Gather inputs from subject matter experts and stakeholders

  • Review lessons learned from previous similar projects

  • Research best practices for your type of project

  • Identify relevant data, reports, and documentation needed

Define Detailed Project Requirements and Deliverables

  • Identify all project requirements and specifications

  • Define tangible project deliverables and desired results 

  • Outline acceptance criteria for deliverables

  • Tie deliverables directly back to project goals and objectives

Break Down into Phases, Tasks and Milestones

  • Divide project into logical phases or stages 

  • Break phases down into individual tasks and activities

  • Identify key milestones and target completion dates

  • Estimate duration of each task

  • Sequence tasks chronologically or by dependency

Plan Project Resources and Team Structure

  • Determine number of resources needed, including staffing, equipment, venues, materials

  • Outline project roles, responsibilities and reporting structure

  • Identify external vendors or consultants needed

  • Assign tasks and milestones to members of the project team

Develop Detailed Project Timeline

  • Create a comprehensive timeline for executing project tasks

  • Build dependencies between tasks into timeline

  • Allow buffer time between tasks and milestones

  • Include target start and end dates for each activity

  • Ensure timeline aligns with overall delivery date

Define Project Communications Framework

  • Determine communications strategy - format, frequency, recipients

  • Outline status reports, meetings and other touchpoints

  • Define roles and responsibilities for communications 

  • Determine change management approval processes

Conduct Risk Assessment and Planning

  • Identify potential risks and triggers that can derail project

  • Assess likelihood and potential impact for each key risk

  • Define risk mitigation strategies and contingency plans

  • Incorporate risk planning into timeline

Establish Accurate Budget and Cost Estimates

  • Develop detailed budget required for resources, materials, travel 

  • Build in appropriate contingency reserve into budget

  • Define system for tracking and controlling project costs

  • Determine approval process for budget changes

Document and Organize Project Outline Structure

  • Organize outline in logical sections with consistent formatting

  • Use numbered headings, bullet points and tables where applicable

  • Include sufficient detail but avoid irrelevant minutiae

  • Ensure clarity for stakeholders who will read outline

Key Components of a Solid Project Outline

While project outlines can take many forms, these are the core components that should be included:

Executive Summary Section

  • High-level overview of project goals, scope, timeline and budget

  • Summary of business needs and benefits to be achieved 

Background Section

  • Business context, history, and drivers initiating the project

  • Review of current environment, challenges, and problems

Goals, Objectives and Scope Section

  • Clearly defines goals, objectives and target outcomes

  • Outlines detailed project scope and boundaries

  • Identifies requirements, constraints and assumptions

Milestones and Schedule Section

  • Lists major phases and milestones with target dates

  • Overview of project timeline and completion date

  • Defines project management methodology

Deliverables Section

  • Provides detailed description of project deliverables

  • Outlines acceptance criteria for each deliverable

  • Links deliverables to objectives and requirements

Resources and Team Section

  • Identifies all resources - people, equipment, materials

  • Defines roles and responsibilities for each team member

  • Overview of project organization and reporting structure

Communications Plan Section

  • Describes overall communications framework 

  • Defines regular meetings, status updates, reports frequency

  • Outlines stakeholder communications matrix

Risks, Issues and Mitigations Section

  • Identifies potential risks, likelihood, impact and triggers

  • Defines risk management processes and mitigation steps

  • Outlines issue escalation procedures

Budget and Costs Section

  • Provides detailed project budget breakdown

  • Estimates costs for resources, travel, materials

  • Outlines high-level allocation of budget

Conclusion and Approval Section

  • Recaps key facts about project goals, timeline, budget

  • Outlines outstanding decisions needed

  • Specifies project approval requirements

Helpful Templates for Project Outlines

Leveraging pre-built project outline templates can help accelerate your outline creation and ensure you capture all relevant elements. Here are two template options:

Simple Project Outline Template

  • Project Name

  • Project Manager

  • Project Purpose

  • Scope and Limitations

  • Major Phases and Milestones 

  • Timeline and Schedule 

  • Budget and Costs

  • Resources and Team Structure

  • Communications Framework

  • Risk Analysis and Mitigations

  • Project Approval Requirements

Comprehensive Project Outline Template

  • Executive Summary

    • Goals, Scope, Timeline, Budget

    • Business Drivers, Benefits

  • Background

    • Current Environment

    • Business Needs and Problems

    • Options Analysis

  • Goals and Objectives

    • Issues to Resolve

    • Target Outcomes andMetrics

  • Scope and Requirements

    • Boundaries, Constraints

    • Assumptions, Dependencies

  • Project Phases and Milestones

    • Phase 1 Name and End Date

    • Phase 2 Name and End Date

    • Phase 3 Name and End Date

  • Deliverables

    • Deliverable 1 Description and Acceptance Criteria

    • Deliverable 2 Description and Acceptance Criteria

  • Budget and Cost Estimates

    • Labor, Materials, Travel

    • Contingency and Reserves 

    • Cost Control Processes

  • Team Structure and Resources

    • Team Member Roles

    • Skills and Competencies

    • Vendor and Supplier List

  • Communications Plan

    • Stakeholder Matrix

    • Status Reports, Meetings

    • Change Management

  • Risk Assessment and Mitigation

    • Top 5 Risks, Severity, Likelihood

    • Risk Mitigation Strategies

    • Contingency Plans

  • Project Approval

    • Approval Criteria

    • Next Steps

Helpful Tips for Writing Effective Project Outlines

Keep these tips in mind as you develop your project outline for the greatest chance of success:

  • Maintain high-level perspective, avoid excessive minutiae

  • Use consistent formatting and logical numbering for clarity

  • Include concrete deadlines for milestones and project completion

  • Define quantitative targets and metrics for deliverables

  • Build in buffer time in schedule to allow flexibility

  • Outline personnel, financial, technology resources needed

  • Assign clear roles and responsibilities to all team members

  • Set regular communications cadence with stakeholders

  • Address risk management and contingency planning

  • Clearly define approval criteria and processes upfront

  • Continuously refine outline as new information emerges

Conclusion and Final Recommendations

Creating a comprehensive, well-structured project outline sets your project up for a successful outcome. This guide provided a detailed overview of how to write an effective project outline along with templates, examples and tips.

Here are some final recommendations to remember:

  • Develop outline in collaboration with project sponsors and key stakeholders

  • Maintain outline as a living document and update it regularly

  • Use the outline to inform detailed project plans and processes

  • Ensure all team members understand roles outlined in project outline

  • Obtain formal outline approval and sign-off before kickoff

With a solid project outline as your foundation, you can confidently move forward in planning the details and launch of your project. The time invested in creating an effective outline will pay dividends throughout the project lifecycle and set your project up for successful delivery within scope, on time and on budget.

The Ultimate Guide to Writing a Successful Project Outline: Templates and Tips

A comprehensive project outline is the foundation of any successful project and provides a detailed overview of your upcoming project plan. Investing time in creating a thorough outline will ensure your project stays focused and organized from start to finish. This ultimate guide will provide everything you need to know about crafting the perfect project outline, including outline templates, examples, components, and tips to write an effective outline that leads to project success.

Why You Absolutely Need a Solid Project Outline

Creating a detailed project outline is one of the most critical steps to take before kicking off any new project. An outline acts as your roadmap that guides the direction of your project throughout its lifecycle. Here are some of the key reasons why taking the time to write a comprehensive project outline is so important:

  • Keeps the entire project logically structured and focused from start to finish

  • Clearly defines the scope, objectives, requirements, and goals of the project 

  • Identifies all major project phases and milestones with target completion dates

  • Allows for accurate estimation and budgeting of resources and time requirements

  • Significantly improves team collaboration and task delegation

  • Minimizes scope creep and prevents the project from derailing off course

  • Provides documentation of all project details for current and future reference

  • Gives a detailed overview for stakeholders, sponsors, and project team members

  • Sets measurable criteria for defining project success

In short, investing time in developing a thorough project outline is essential for the success of any project, large or small. It serves as your blueprint guiding all aspects of your project planning and execution.

Step-by-Step Guide to Writing a Solid Project Outline

Now that you understand the immense value of creating a project outline, let's go through the key steps involved in writing a comprehensive outline from scratch:

Define Project Goals, Scope and Objectives

  • Clearly identify the high-level goals and objectives you want to accomplish

  • Define the overall scope and boundaries of the project

  • Outline the problem(s) to be solved and intended outcomes

  • Keep the scope realistic within time, cost and resource limits

Conduct Research and Information Gathering

  • Gather inputs from subject matter experts and stakeholders

  • Review lessons learned from previous similar projects

  • Research best practices for your type of project

  • Identify relevant data, reports, and documentation needed

Define Detailed Project Requirements and Deliverables

  • Identify all project requirements and specifications

  • Define tangible project deliverables and desired results 

  • Outline acceptance criteria for deliverables

  • Tie deliverables directly back to project goals and objectives

Break Down into Phases, Tasks and Milestones

  • Divide project into logical phases or stages 

  • Break phases down into individual tasks and activities

  • Identify key milestones and target completion dates

  • Estimate duration of each task

  • Sequence tasks chronologically or by dependency

Plan Project Resources and Team Structure

  • Determine number of resources needed, including staffing, equipment, venues, materials

  • Outline project roles, responsibilities and reporting structure

  • Identify external vendors or consultants needed

  • Assign tasks and milestones to members of the project team

Develop Detailed Project Timeline

  • Create a comprehensive timeline for executing project tasks

  • Build dependencies between tasks into timeline

  • Allow buffer time between tasks and milestones

  • Include target start and end dates for each activity

  • Ensure timeline aligns with overall delivery date

Define Project Communications Framework

  • Determine communications strategy - format, frequency, recipients

  • Outline status reports, meetings and other touchpoints

  • Define roles and responsibilities for communications 

  • Determine change management approval processes

Conduct Risk Assessment and Planning

  • Identify potential risks and triggers that can derail project

  • Assess likelihood and potential impact for each key risk

  • Define risk mitigation strategies and contingency plans

  • Incorporate risk planning into timeline

Establish Accurate Budget and Cost Estimates

  • Develop detailed budget required for resources, materials, travel 

  • Build in appropriate contingency reserve into budget

  • Define system for tracking and controlling project costs

  • Determine approval process for budget changes

Document and Organize Project Outline Structure

  • Organize outline in logical sections with consistent formatting

  • Use numbered headings, bullet points and tables where applicable

  • Include sufficient detail but avoid irrelevant minutiae

  • Ensure clarity for stakeholders who will read outline

Key Components of a Solid Project Outline

While project outlines can take many forms, these are the core components that should be included:

Executive Summary Section

  • High-level overview of project goals, scope, timeline and budget

  • Summary of business needs and benefits to be achieved 

Background Section

  • Business context, history, and drivers initiating the project

  • Review of current environment, challenges, and problems

Goals, Objectives and Scope Section

  • Clearly defines goals, objectives and target outcomes

  • Outlines detailed project scope and boundaries

  • Identifies requirements, constraints and assumptions

Milestones and Schedule Section

  • Lists major phases and milestones with target dates

  • Overview of project timeline and completion date

  • Defines project management methodology

Deliverables Section

  • Provides detailed description of project deliverables

  • Outlines acceptance criteria for each deliverable

  • Links deliverables to objectives and requirements

Resources and Team Section

  • Identifies all resources - people, equipment, materials

  • Defines roles and responsibilities for each team member

  • Overview of project organization and reporting structure

Communications Plan Section

  • Describes overall communications framework 

  • Defines regular meetings, status updates, reports frequency

  • Outlines stakeholder communications matrix

Risks, Issues and Mitigations Section

  • Identifies potential risks, likelihood, impact and triggers

  • Defines risk management processes and mitigation steps

  • Outlines issue escalation procedures

Budget and Costs Section

  • Provides detailed project budget breakdown

  • Estimates costs for resources, travel, materials

  • Outlines high-level allocation of budget

Conclusion and Approval Section

  • Recaps key facts about project goals, timeline, budget

  • Outlines outstanding decisions needed

  • Specifies project approval requirements

Helpful Templates for Project Outlines

Leveraging pre-built project outline templates can help accelerate your outline creation and ensure you capture all relevant elements. Here are two template options:

Simple Project Outline Template

  • Project Name

  • Project Manager

  • Project Purpose

  • Scope and Limitations

  • Major Phases and Milestones 

  • Timeline and Schedule 

  • Budget and Costs

  • Resources and Team Structure

  • Communications Framework

  • Risk Analysis and Mitigations

  • Project Approval Requirements

Comprehensive Project Outline Template

  • Executive Summary

    • Goals, Scope, Timeline, Budget

    • Business Drivers, Benefits

  • Background

    • Current Environment

    • Business Needs and Problems

    • Options Analysis

  • Goals and Objectives

    • Issues to Resolve

    • Target Outcomes andMetrics

  • Scope and Requirements

    • Boundaries, Constraints

    • Assumptions, Dependencies

  • Project Phases and Milestones

    • Phase 1 Name and End Date

    • Phase 2 Name and End Date

    • Phase 3 Name and End Date

  • Deliverables

    • Deliverable 1 Description and Acceptance Criteria

    • Deliverable 2 Description and Acceptance Criteria

  • Budget and Cost Estimates

    • Labor, Materials, Travel

    • Contingency and Reserves 

    • Cost Control Processes

  • Team Structure and Resources

    • Team Member Roles

    • Skills and Competencies

    • Vendor and Supplier List

  • Communications Plan

    • Stakeholder Matrix

    • Status Reports, Meetings

    • Change Management

  • Risk Assessment and Mitigation

    • Top 5 Risks, Severity, Likelihood

    • Risk Mitigation Strategies

    • Contingency Plans

  • Project Approval

    • Approval Criteria

    • Next Steps

Helpful Tips for Writing Effective Project Outlines

Keep these tips in mind as you develop your project outline for the greatest chance of success:

  • Maintain high-level perspective, avoid excessive minutiae

  • Use consistent formatting and logical numbering for clarity

  • Include concrete deadlines for milestones and project completion

  • Define quantitative targets and metrics for deliverables

  • Build in buffer time in schedule to allow flexibility

  • Outline personnel, financial, technology resources needed

  • Assign clear roles and responsibilities to all team members

  • Set regular communications cadence with stakeholders

  • Address risk management and contingency planning

  • Clearly define approval criteria and processes upfront

  • Continuously refine outline as new information emerges

Conclusion and Final Recommendations

Creating a comprehensive, well-structured project outline sets your project up for a successful outcome. This guide provided a detailed overview of how to write an effective project outline along with templates, examples and tips.

Here are some final recommendations to remember:

  • Develop outline in collaboration with project sponsors and key stakeholders

  • Maintain outline as a living document and update it regularly

  • Use the outline to inform detailed project plans and processes

  • Ensure all team members understand roles outlined in project outline

  • Obtain formal outline approval and sign-off before kickoff

With a solid project outline as your foundation, you can confidently move forward in planning the details and launch of your project. The time invested in creating an effective outline will pay dividends throughout the project lifecycle and set your project up for successful delivery within scope, on time and on budget.

The Ultimate Guide to Writing a Successful Project Outline: Templates and Tips

A comprehensive project outline is the foundation of any successful project and provides a detailed overview of your upcoming project plan. Investing time in creating a thorough outline will ensure your project stays focused and organized from start to finish. This ultimate guide will provide everything you need to know about crafting the perfect project outline, including outline templates, examples, components, and tips to write an effective outline that leads to project success.

Why You Absolutely Need a Solid Project Outline

Creating a detailed project outline is one of the most critical steps to take before kicking off any new project. An outline acts as your roadmap that guides the direction of your project throughout its lifecycle. Here are some of the key reasons why taking the time to write a comprehensive project outline is so important:

  • Keeps the entire project logically structured and focused from start to finish

  • Clearly defines the scope, objectives, requirements, and goals of the project 

  • Identifies all major project phases and milestones with target completion dates

  • Allows for accurate estimation and budgeting of resources and time requirements

  • Significantly improves team collaboration and task delegation

  • Minimizes scope creep and prevents the project from derailing off course

  • Provides documentation of all project details for current and future reference

  • Gives a detailed overview for stakeholders, sponsors, and project team members

  • Sets measurable criteria for defining project success

In short, investing time in developing a thorough project outline is essential for the success of any project, large or small. It serves as your blueprint guiding all aspects of your project planning and execution.

Step-by-Step Guide to Writing a Solid Project Outline

Now that you understand the immense value of creating a project outline, let's go through the key steps involved in writing a comprehensive outline from scratch:

Define Project Goals, Scope and Objectives

  • Clearly identify the high-level goals and objectives you want to accomplish

  • Define the overall scope and boundaries of the project

  • Outline the problem(s) to be solved and intended outcomes

  • Keep the scope realistic within time, cost and resource limits

Conduct Research and Information Gathering

  • Gather inputs from subject matter experts and stakeholders

  • Review lessons learned from previous similar projects

  • Research best practices for your type of project

  • Identify relevant data, reports, and documentation needed

Define Detailed Project Requirements and Deliverables

  • Identify all project requirements and specifications

  • Define tangible project deliverables and desired results 

  • Outline acceptance criteria for deliverables

  • Tie deliverables directly back to project goals and objectives

Break Down into Phases, Tasks and Milestones

  • Divide project into logical phases or stages 

  • Break phases down into individual tasks and activities

  • Identify key milestones and target completion dates

  • Estimate duration of each task

  • Sequence tasks chronologically or by dependency

Plan Project Resources and Team Structure

  • Determine number of resources needed, including staffing, equipment, venues, materials

  • Outline project roles, responsibilities and reporting structure

  • Identify external vendors or consultants needed

  • Assign tasks and milestones to members of the project team

Develop Detailed Project Timeline

  • Create a comprehensive timeline for executing project tasks

  • Build dependencies between tasks into timeline

  • Allow buffer time between tasks and milestones

  • Include target start and end dates for each activity

  • Ensure timeline aligns with overall delivery date

Define Project Communications Framework

  • Determine communications strategy - format, frequency, recipients

  • Outline status reports, meetings and other touchpoints

  • Define roles and responsibilities for communications 

  • Determine change management approval processes

Conduct Risk Assessment and Planning

  • Identify potential risks and triggers that can derail project

  • Assess likelihood and potential impact for each key risk

  • Define risk mitigation strategies and contingency plans

  • Incorporate risk planning into timeline

Establish Accurate Budget and Cost Estimates

  • Develop detailed budget required for resources, materials, travel 

  • Build in appropriate contingency reserve into budget

  • Define system for tracking and controlling project costs

  • Determine approval process for budget changes

Document and Organize Project Outline Structure

  • Organize outline in logical sections with consistent formatting

  • Use numbered headings, bullet points and tables where applicable

  • Include sufficient detail but avoid irrelevant minutiae

  • Ensure clarity for stakeholders who will read outline

Key Components of a Solid Project Outline

While project outlines can take many forms, these are the core components that should be included:

Executive Summary Section

  • High-level overview of project goals, scope, timeline and budget

  • Summary of business needs and benefits to be achieved 

Background Section

  • Business context, history, and drivers initiating the project

  • Review of current environment, challenges, and problems

Goals, Objectives and Scope Section

  • Clearly defines goals, objectives and target outcomes

  • Outlines detailed project scope and boundaries

  • Identifies requirements, constraints and assumptions

Milestones and Schedule Section

  • Lists major phases and milestones with target dates

  • Overview of project timeline and completion date

  • Defines project management methodology

Deliverables Section

  • Provides detailed description of project deliverables

  • Outlines acceptance criteria for each deliverable

  • Links deliverables to objectives and requirements

Resources and Team Section

  • Identifies all resources - people, equipment, materials

  • Defines roles and responsibilities for each team member

  • Overview of project organization and reporting structure

Communications Plan Section

  • Describes overall communications framework 

  • Defines regular meetings, status updates, reports frequency

  • Outlines stakeholder communications matrix

Risks, Issues and Mitigations Section

  • Identifies potential risks, likelihood, impact and triggers

  • Defines risk management processes and mitigation steps

  • Outlines issue escalation procedures

Budget and Costs Section

  • Provides detailed project budget breakdown

  • Estimates costs for resources, travel, materials

  • Outlines high-level allocation of budget

Conclusion and Approval Section

  • Recaps key facts about project goals, timeline, budget

  • Outlines outstanding decisions needed

  • Specifies project approval requirements

Helpful Templates for Project Outlines

Leveraging pre-built project outline templates can help accelerate your outline creation and ensure you capture all relevant elements. Here are two template options:

Simple Project Outline Template

  • Project Name

  • Project Manager

  • Project Purpose

  • Scope and Limitations

  • Major Phases and Milestones 

  • Timeline and Schedule 

  • Budget and Costs

  • Resources and Team Structure

  • Communications Framework

  • Risk Analysis and Mitigations

  • Project Approval Requirements

Comprehensive Project Outline Template

  • Executive Summary

    • Goals, Scope, Timeline, Budget

    • Business Drivers, Benefits

  • Background

    • Current Environment

    • Business Needs and Problems

    • Options Analysis

  • Goals and Objectives

    • Issues to Resolve

    • Target Outcomes andMetrics

  • Scope and Requirements

    • Boundaries, Constraints

    • Assumptions, Dependencies

  • Project Phases and Milestones

    • Phase 1 Name and End Date

    • Phase 2 Name and End Date

    • Phase 3 Name and End Date

  • Deliverables

    • Deliverable 1 Description and Acceptance Criteria

    • Deliverable 2 Description and Acceptance Criteria

  • Budget and Cost Estimates

    • Labor, Materials, Travel

    • Contingency and Reserves 

    • Cost Control Processes

  • Team Structure and Resources

    • Team Member Roles

    • Skills and Competencies

    • Vendor and Supplier List

  • Communications Plan

    • Stakeholder Matrix

    • Status Reports, Meetings

    • Change Management

  • Risk Assessment and Mitigation

    • Top 5 Risks, Severity, Likelihood

    • Risk Mitigation Strategies

    • Contingency Plans

  • Project Approval

    • Approval Criteria

    • Next Steps

Helpful Tips for Writing Effective Project Outlines

Keep these tips in mind as you develop your project outline for the greatest chance of success:

  • Maintain high-level perspective, avoid excessive minutiae

  • Use consistent formatting and logical numbering for clarity

  • Include concrete deadlines for milestones and project completion

  • Define quantitative targets and metrics for deliverables

  • Build in buffer time in schedule to allow flexibility

  • Outline personnel, financial, technology resources needed

  • Assign clear roles and responsibilities to all team members

  • Set regular communications cadence with stakeholders

  • Address risk management and contingency planning

  • Clearly define approval criteria and processes upfront

  • Continuously refine outline as new information emerges

Conclusion and Final Recommendations

Creating a comprehensive, well-structured project outline sets your project up for a successful outcome. This guide provided a detailed overview of how to write an effective project outline along with templates, examples and tips.

Here are some final recommendations to remember:

  • Develop outline in collaboration with project sponsors and key stakeholders

  • Maintain outline as a living document and update it regularly

  • Use the outline to inform detailed project plans and processes

  • Ensure all team members understand roles outlined in project outline

  • Obtain formal outline approval and sign-off before kickoff

With a solid project outline as your foundation, you can confidently move forward in planning the details and launch of your project. The time invested in creating an effective outline will pay dividends throughout the project lifecycle and set your project up for successful delivery within scope, on time and on budget.